Ask us anything

How to replace the control board in my Goodman DSZC18 heat pump for better performance?

Replacing the control board in your Goodman DSZC18 heat pump can be a complex task that requires electrical and HVAC knowledge. A malfunctioning control board can indeed affect the performance of your heat pump, but it's crucial to follow safety precautions and ensure that you're comfortable with the process. Here are general steps to replace the control board:

Safety Precautions:
1. Turn Off Power: Shut off the electrical power to the heat pump at the disconnect switch or breaker panel to prevent electrical shock.
2. Wear Safety Gear: Use appropriate safety gear, including gloves and safety goggles.
3. Label Wires: Before disconnecting any wires, label them or take clear photographs for reference during reinstallation.
Steps to Replace the Control Board:
4. Access the Heat Pump:
Remove the access panel(s) to gain access to the control board inside the heat pump.
Be cautious and follow safety guidelines to avoid electrical shock.
5. Locate the Control Board:
Identify the control board, which is typically mounted on or near the blower unit or air handler.
6. Disconnect Wiring:
Carefully disconnect the wiring connected to the control board. These connections may include thermostat wires, power supply wires, and control wires.
Take note of the wire locations and connections.
7. Remove the Old Control Board:
The control board may be secured with screws or fasteners. Remove these to detach the board from its mounting location.
Carefully remove the old control board from the heat pump.
8. Install the New Control Board:
Position the new control board in the same orientation and location as the old one.
Secure it in place with screws or fasteners.
9. Reconnect Wiring:
Reconnect the wiring to the new control board according to your earlier notes or photographs.
10. Verify Wiring and Settings:
Double-check that all wires are correctly connected to the new control board.
Ensure that dip switches or jumpers (if present) are configured to match your heat pump's settings.
11. Power On and Test:
Restore power to the heat pump by turning on the disconnect switch or breaker.
Test the heat pump to verify proper operation and control board functionality.
Monitor the system for any unusual behavior or error codes.
12. Check for Errors: If you encounter any error codes or issues with the heat pump's performance, consult the heat pump's manual or the documentation for the new control board to troubleshoot and resolve the problem.
13. Regular Maintenance:
Make a record of the date when you replaced the control board. Routine maintenance and inspections can help prevent control board issues in the future.

Remember that replacing a control board involves working with electrical components and can affect the safety and performance of your heat pump. If you're unsure about any aspect of the replacement process, it's strongly recommended to consult a qualified HVAC technician. They can ensure that the replacement is done correctly, preventing potential electrical hazards and ensuring the heat pump operates efficiently and reliably.
FAQ
Connect to virtual expert

Our virtual experts can diagnose your issue and resolve simple problems.